Skip to main content
Bethlehem ConnectPlanning phase — home

Bethlehem Connect · Place sheet · Station area 4 · South

Mountaintop / Iacocca Hall

Innovation campus · gondola angle station option · near a proposed garden · geology space

Phase 1 · conditional target 2029

Typology: Mountain / innovation

Planning phase. An independent plan; nothing is funded or built yet.

Locator map of Mountaintop / Iacocca Hall and the lines around it
  • 4Mountaintop / Iacocca Hall

Connect Spine (Phase 1)River Line (Phase 1)Dashed: options and if-demand linksGondola optionLANTA EBS todayShaded area: a station area or evaluated destination on Lehigh, hospital, casino or private retail land, not a site

Why here

Mountaintop sits about 180 m above Goodman. The Spine bus serves this stop from day one; a gondola could make the climb in about 6 minutes per section if studies support it.

Program ideas (planning phase)

  • Heated waiting room and snow-melt at the platform edge
  • Gondola angle station (option)
  • Near Mountaintop Discovery Gardens, a separate student-initiated garden idea (not sponsored or endorsed by Lehigh University; it includes no transit or museum parts)
  • Above-ground or earth-sheltered geology learning pavilion at the station, with rock cores and a rock garden of local stone (no mined underground museum); separate from the garden
  • Trail links to Lehigh's Forest Park

Every station also gets the station kit: level boarding, shelter, lighting, real-time screens, bike racks, a rain garden and a sorting point for recycling, compost and trash.

Measured here

Lines
Connect Spine — electric BRT
Elevation
275 m (USGS 3DEP)
10-minute walk
33 ha · 12 buildings · 57 places
LANTA today
No LANTA trips within 400 m in the 2022 timetable
Future train access
From Mountaintop / Iacocca Hall, about 9 minutes on Bethlehem Connect to the rail-ready stop at Farrington Square.

The station area

The stop would be a Spine bus platform, with a gondola angle station as an option. Both would need Lehigh's agreement. Mountaintop Discovery Gardens is a separate, student-initiated idea with its own status; this plan does not show or assume its design.

What exists today

  • No LANTA trips within 400 m in 2022 timetable data; Lehigh shuttles serve the campus.
  • Lehigh's Forest Park opened its first public trail on 22 April 2026.

Still unknown

  • Lehigh's agreement on siting and stewardship
  • Winter wind and ice exposure
  • Bus-bridge plan for gondola wind or lightning holds

Place sheet v1.5 · 22 October 2026 · website-five-tau-72.vercel.app/files/places/mountaintop.pdf

Bethlehem Connect is an independent plan by David Fischbarg, in the planning phase. Nothing is funded or built yet. It is not an official project of, or endorsed by, any agency, university, hospital, company or the City named on this sheet. No route, station or facility has been surveyed, engineered or funded. No passenger trains run in Bethlehem today, and no regional rail route has been chosen. Data: Overture Maps 2026-09-23.1 (© OpenStreetMap contributors; ESA WorldCover, CC BY 4.0), USGS 3DEP terrain, LANTA 2022 timetable (service has changed since). Lines are corridors on existing streets, not engineered routes.